Himt logo
Online Booking
  • Home
  • About HIMT
    • CEO’S DESK
    • Our Faculty
    • Timeline of HIMT
    • Advisory Board
    • Industry Reviews
    • Press Clippings
    • Corporate Social Responsibility
    • Awards and Accreditations
    • Green Initiatives 
  • Courses
    • DG Shipping Approved Post-Sea Courses
    • DG Shipping Approved Courses at VIZAG
    • DG Shipping Approved Discounted Package
    • UK MCA Approved Courses
    • UK MCA Approved Discounted Package
    • DG Shipping Approved Pre Sea Courses
  • Gallery
  • Campus
    • Campus
    • Careers
    • Nearby Accommodations
  • Student Corner
    • Student Login
    • Testimonial
    • Certificate Verification
    • Encounters @ Sea
    • Technical Papers
    • GMDSS Results
    • Submission Procedure
    • Discounts and Offers
  • VR Module
    • Virtual Reality Module

COPT FAILURE DUE TO HIGH SALINITY OF BOILER WATER

Browse

  • Home
  • encounters @ sea
  • COPT FAILURE DUE TO HIGH SALINITY OF BOILER WATER
  • February 11, 2020

Name: Kemillten Antone
Student ID: 60051 Rank: III rd Engineer

Summary:
F.W.G gave way and leaked. Salinometer malfunction. In two days high salinity water had filled in Distilled F.W. Tank, kept for boiler. Weekly checks of Salinometer had to be done. Daily checks of water from F.W.G. has to be done. Boiler water cascade tank was fitted with a salinometer, to verify that the feed water salinity is under control.

Corrective Action/ Lessons to be learnt:
Discharge operation stopped. Found boiler water salinity to be above 450ppm. Later found boiler water Distilled fresh water tanks ppm. To be high too. Distilled water to be taken from shore. Boilers completely blown down, tanks emptied after completion of discharge. COPT valves found fully corroded. Valves changed. Inlet & drain valves. Fresh water Generator salinometer found to be defective. Sea water had been filling in dist. F.W.Tank. Daily checks of F.W.G. water salinity to be maintained.
Suggested all testing and indicating instruments to be calibrated by authorised labs at least once a year.
Incident:
Cargo oil turbines’ sentinel valves found spraying water. Vacuum condenser pressure showing positive instead of negative. Vacuum condenser & condensate temperature found very high. The valves were found corroded badly. COPT. Governor found to be hunting, hence turbine hunting. The high salinity of boiler water had led to the corrosion.

Himt Marine

Approved by D.G.Shipping, Govt. of India, ISO 9001:2015 certified and also graded A1 Outstanding by DNV, HIMT offers all D.G.Shipping-approved courses under a single roof, from basic STCW courses to the highest level of Competency courses. This comprehensive approach ensures that maritime professionals can find a complete spectrum of training options available to them, catering to every stage of their Maritime career.

Quick Links

  • FAQs
  • Careers
  • Courses
  • E-Brochure

Other Links

  • How to Book Courses at HIMT?
  • Employee Login
  • Medical Examiners
  • Submission Procedure

Contact

Hindustan Institute of Maritime Training
11, Millers Road, Kilpauk,
Chennai – 600 010.

+91 98404 00000

[email protected]

Business Hours

Mon-Sat 6 AM to 6 PM
  • Privacy Policy
  • Terms & Conditions
© 2025 All rights reserved - HIMT
Go to mobile version